Big Man Rock Mall Construction Method
In the burial work of infrastructure pipes, it used to be a long-term difficult work due to noise and vibration restrictions in urban areas where rocks are the foundation.
KOKEN’s “Big man Rock Mall Construction Method” is a construction method in which a small-diameter drilling hole is first penetrated and then pulled up from the reaching side to the starting side with a dedicated large-diameter lifting drill “Reaming Bit”. Realized construction with noise. It has been well received that it can shorten the construction period and has many achievements.